• <tfoot id="ii0ii"><noscript id="ii0ii"></noscript></tfoot>
  • <code id="ii0ii"></code>
  • <nav id="ii0ii"><code id="ii0ii"></code></nav>
  • <sup id="ii0ii"><code id="ii0ii"></code></sup>
    • <tfoot id="ii0ii"><dd id="ii0ii"></dd></tfoot>

      狠狠噜狠狠狠狠丁香五月,人妻出轨无码中文一区二区,狠狠色丁香久久婷婷综合五月,亚洲中久无码永久在线观看同

      Home>>

      New subway line drilled through in Beijing

      (Xinhua) 09:21, October 22, 2024

      BEIJING, Oct. 21 (Xinhua) -- The entire tunnel of Beijing Subway Line 17 was drilled through after the middle section of the tunnel was bored through on Monday, its builder China Railway 14th Bureau Group Corporation Limited announced.

      Beijing Subway Line 17 is a major transportation artery that runs north to south in the Chinese capital, where about 21.9 million people live.

      With a total length of 49.7 kilometers, Line 17 is designed to have 21 stations. The northern and southern sections of the line opened to traffic in 2023 and in 2021.

      Once the entire line is operational in the future, it is expected to alleviate traffic pressure on Line 5 and Line 10.

      (Web editor: Zhang Kaiwei, Liang Jun)

      Photos

      Related Stories

      狠狠噜狠狠狠狠丁香五月
    • <tfoot id="ii0ii"><noscript id="ii0ii"></noscript></tfoot>
    • <code id="ii0ii"></code>
    • <nav id="ii0ii"><code id="ii0ii"></code></nav>
    • <sup id="ii0ii"><code id="ii0ii"></code></sup>
      • <tfoot id="ii0ii"><dd id="ii0ii"></dd></tfoot>